A: We are a factory, our factory is named Kidyson Mold, it was established in Shenzhen Shajing. Our factory is 33000 square feet.
A: Green Vitality Industry has ISO9001:2015. And we are planning to apply for ISO9001:14000.
A: We strictly implement the relevant requirements of ISO, and we have a standardized quality control process to to ensure the quality of each link.
A: We have 24 sets of injection molding machines from 90T-400T.
A: We have about 52 people, 4 designers and 3 engineers, and 4 QC.
A: Auto CAD (Computer-Aided Design), UG ( united graph), solid word, proe are the main software we use on mold design.
A:For mold, we guarantee the precision +/-0.005mm; and for parts, +/-0.01mm.
A: Yes, we have rich experience in 2k mold, insert mold, over mold, gas assist mold, etc. You can check it in the mold section.
A: About 150 molds. Our turnover last year is 4 millions US dollar.
A: First we need your 3d drawing or samples and your requirement such as plastic part material, mold cavity number, mold steel or mold lifetime you expect, hot runner or cold runner, injection machine tonnage. Then we send you quotation for your negociation and confirmation. Once price approved and sign contract, we will send you DFM for your confirmation, then start mold processing, during mold processing we will send you weekly report to show you what stage we are in, after mold finishing, we will make mold testing and send you samples for approval, if need modification we will send you improved sample for approval, once samples approved we will ship the mold, if you need the mass production parts, we will produce the parts for you then pack and ship the goods.
A: We export molds and parts to North America, South America, Europe, Mid-east and Oceania.
We make all kinds of plastic parts, and major in household products, small and middle-size auto parts, electronic accessories, kids' toys, medical parts.
A: For mold payment, we usually adopt 40% against PO as deposit, 40% after T1 samples, and the final 20% before mold shipment. For injection production, 50% against PO, final 50% before shipment.
It could be flexible, we can discuss it in detail projects.
Of course, other payment terms are acceptable when have had a further talk and know more about your project.
A: We will sign a Confidentiality Agreement, and in our factory, we have the personnel to collect the samples when mold testing. When the samples are shown in our sample room, we have a list to mark details and quantity. Nobody can take them away without approval and registration.
A: As you know there are many mold makers, and for us, what we are confident is for 3 points:
1) Management. It includes 2 parts---factory management & project management.
Our factory manager has more than 10years of managing experience for a Japanese company (Rioch & Sumitomo), so based on ISO9001:2015, our company adopt modern Japanese business management to ensure the factory work in the right way.
Project management: All our project engineers have rich experience in plastic mold and molding, we also have a series of documents to ensure each process is in control, please check one of our project control documents for your reference.
2) One-stop service: We could offer service from part design until final shipping. We also provide out-source services of dustless auto painting, electroplating, silkscreen, to partner factories. They are well -cooperated with us. So if you have a project, no need to manage several suppliers. We could manage all for you.
3) Responsible & reliable. We are responsible for all the molds and parts from us. For example, If have any problems, if confirmed for our mistake. We could pay the repair cost, or even if, in need, our engineers could fly directly to your factory to help you solve your problems.
A: Normally if the mold is not damaged by man mistake operations, we have 1 year guarantee. During the time, we will repair the mold by sending it back to our factory, or our engineers will fly to your country.
For some wearing or consumable parts, we will prepare the interchangeable spare parts together with mold shipment.
A: We have a project manager to follow up on the outsourcing project, the strict requirement we have for them as we make in our own factory, of course, we attach importance to choose the proper supplier, that is important.
A: Usually we use plastic film to cover the mold, and pack it with a ply-wood case.
If you need a vacuum package, we will do it for your requirement.
A: No, we have our stable cooperation to do painting/electroplating/silk print for us, this is our outsourcing service. We have assembled a department.